Skip to content
    • Licensed electrical contractor (REC 38187)
    • Lifetime workmanship guarantee
    • Upfront pricing: you get the price before we start
    • 4.9 from 34 Google reviews
    • Family-run, 19 years in the industry
    • Free, no-obligation quotes
    • Based in Altona Meadows, serving Melbourne's west
    • One local team for electrical, heating and cooling
    • Open Mon–Sat, 7am–5:30pm
    How it works

    How a job works, from enquiry to handover

    Six plain steps, the same for a single power point or a new heating and cooling system. You always know what happens next, and you get the price before we start.

    1. Tell us about the job
    2. We confirm the scope and access
    3. You get the price before we start
    4. The work, done properly
    5. Tidy-up and handover
    6. Lifetime workmanship guarantee
    • Upfront pricing
    • Lifetime workmanship guarantee
    • Free, no-obligation quotes
    • Family-run, 19 years in the industry

    One question at a time

    Get a free quote

    Takes about 2 minutes. Free, no-obligation quotes.

    Your job

    What do you need help with?

    Pick the closest match. You can change it later.

    • Upfront price
    • Lifetime workmanship guarantee
    • REC 38187
    Licensed and insured
    Lifetime workmanship guarantee
    Upfront pricing
    Family-run, 19 years in the industry
    4.9 out of 5 stars,34 Google reviews (opens the Google profile)
    Start to finish

    The six steps

    What happens at each stage, and what you have in hand at the end of it.

    1. Step 1

      Tell us about the job

      Send an enquiry through the form. It asks one question at a time: what needs doing, the type of property, your suburb and when suits you. If you have photos, mention it and we'll ask for them when we get in touch.

      What you get: A reference on screen once your enquiry is saved.

    2. Step 2

      We confirm the scope and access

      We read the details, check your address is in our area and contact you by email or phone, whichever you chose. We agree a day and a morning or afternoon window, and ask about anything we need to reach: the switchboard, the roof space, outdoor units, parking and pets.

      What you get: A confirmed day and arrival window to plan around.

    3. Step 3

      You get the price before we start

      Some jobs can be priced from your description and photos; others need a look first. Either way, you get the price and what it covers before any work starts. It's a fixed price for the agreed scope, and nothing extra goes ahead without your agreement.

      What you get: An upfront, fixed price for the agreed scope. Free, with no obligation.

    4. Step 4

      The work, done properly

      Our licensed electricians and technicians do the work. We tell you before the power goes off and roughly for how long. Electrical work is tested before it goes back into service, and air conditioning is run and checked once it's finished. A new main switchboard is inspected by a Licensed Electrical Inspector before the power goes back on, so we plan that into the job.

      What you get: Long-term fixes, not quick patches. If we find something extra, we stop and price it first.

    5. Step 5

      Tidy-up and handover

      Clean, tidy work: we clear up the work area before we go. Then we walk you through what was done and anything worth keeping an eye on. Whenever a licensed electrician completes electrical installation work, they must provide a Certificate of Electrical Safety, the legal record of the work.

      What you get: Your Certificate of Electrical Safety for electrical work.

    6. Step 6

      Lifetime workmanship guarantee

      Every job carries our lifetime workmanship guarantee. If something we did doesn't look or work right, get in touch and tell us about the job.

      What you get: One local team for electrical, heating and cooling, family-run and based in Altona Meadows.

    Step one

    Tell us what needs doing

    The form asks one question at a time and only what applies to your job. Free, no-obligation quotes.

    Licensed electrical contractor (REC 38187)
    Before the visit

    What to have ready

    A few minutes of preparation means the right parts on the van and fewer surprises on the day.

    Have ready

    • A short list of every job, most important first, so they can be priced together.
    • For a fault: what stopped working, when it started, what was running and which switch moved on the board.
    • Clear access to the meter box and switchboard, with the side gate unlocked.
    • The space under the roof manhole cleared, with room for a ladder.
    • For air conditioning: access to both the indoor unit and the outdoor unit.
    • Pets secured, and a note about parking if the street is tight.
    • A heads-up about a home office, a full freezer or anyone who relies on powered medical equipment.
    • Any model or rating labels you can read safely, or the appliance manual.

    Please leave alone

    • Don't take covers off power points, switches or the switchboard.
    • Don't swap fittings or try a new globe in a fitting that's scorched.
    • Reset a tripped safety switch once. If it won't stay on, leave it off and tell us.

    On the day

    Boots off at the door before coming inside
    Grabbing the tool bag from the ute
    Rentals and businesses

    Renting, managing a rental or running a business

    The steps are the same. These are the extra details that keep the job moving.

    Renting

    • Report the problem to your rental provider or agent first. The rental provider must organise and pay for repairs unless the renter caused the problem.
    • A dangerous electrical fault and failed heating or hot water are on the legal list of urgent repairs for rentals.
    • If the agent asks you to arrange access, tell us in the enquiry who can approve the work and when you'll be home.
    Renting and the power or heating has failed

    Landlords and property managers

    • Add the renter's details, any times to avoid and who can approve extra work, so the visit runs without a second trip.
    • Rental providers must have an electrical safety check done at least every two years, and the electrician should give you a record of the check and its results.
    • Since 29 March 2023, rentals must have modern switchboards with circuit breakers and safety switches.
    Landlords and property managers

    Shops, offices and small business

    • Send the address, your trading hours and what's happening, and we plan the job so it disrupts trade as little as possible.
    • If the power needs to go off, we tell you in advance.
    • We label circuits as we go, and leave the site clean for your staff and customers.
    Shops, offices and small business

    Sometimes. For straightforward jobs we can often price from your description and photos. Older switchboards, faults and cable routes through solid walls usually need a look first. Either way, you get the price before any work starts.

    Sources for the rules on this page

    6 sources, with the date each was checked
    1. 1.Energy Safe Victoria: The electrician has eight business days after the work is completed to have that work inspected by a licensed electrical inspector (LEI). If an electrician replaces a main switchboard at a property, power cannot go back… Accessed 30 September 2026.
    2. 2.Energy Safe Victoria: Whenever a licensed electrician completes any electrical installation work, they must provide a Certificate of Electrical Safety (COES). Accessed 30 September 2026.
    3. 3.Energy Safe Victoria: A Certificate of Electrical Safety (COES) – is a legal document issued by a Registered Electrical Contractor or licensed electrician to record the details of the electrical work they have performed. Accessed 30 September 2026.
    4. 4.Consumer Affairs Victoria: The rental provider must organise and pay for all repairs if they are not the renter’s fault. Accessed 30 September 2026.
    5. 5.Consumer Affairs Victoria: Rental providers who enter into a new agreement after 29 March 2021, must have all electrical installations and fittings checked by a licensed electrician at least once every 2 years. This also applies to rental… Accessed 30 September 2026.
    6. 6.Consumer Affairs Victoria: The electrical safety rental minimum standard commenced on 29 March 2023. Rental properties must have modern switchboards, with circuit breakers and electrical safety switches installed. Electrical safety switches are… Accessed 30 September 2026.

    Ready when you are

    Free, no-obligation quotes. You get the price before we start, and the work carries our lifetime workmanship guarantee.

    Licensed electrical contractor (REC 38187)