    Why does a Licensed Electrical Inspector need to check my new switchboard?

    Updated 9 October 2026

    The short answer
    Because replacing a main switchboard is prescribed work in Victoria. Prescribed work covers the major wiring where the power can't be switched off, such as the consumer mains, meter box and main switchboard, and it must be inspected. Energy Safe Victoria says power can't go back on to a new main switchboard until a Licensed Electrical Inspector has inspected it. Your Certificate of Electrical Safety comes after the inspection.

    Why this work gets a second check

    Most electrical work in a house sits after the main switch, where circuit breakers and safety switches protect it and it can be switched off to work on. The consumer mains, meter box and main switchboard are different. In a home, Energy Safe Victoria says prescribed work generally means work on wiring and equipment that can't be switched off, usually the wires up to the switchboard.

    A mistake there sits ahead of the protection the rest of the house relies on. So Victoria's rules add an inspection by a Licensed Electrical Inspector, who is separate from the electrician who did the work.

    What it means on the day

    Prescribed work can't be switched on, or left on, until it has been inspected. Energy Safe Victoria says the electrician has eight business days after finishing to have the work inspected, but a house can't sit without power that long, so on a switchboard job the inspection is built into the day's plan. We arrange it as part of the job and give you the expected window when we book.

    There is a narrow exception. Repairing or replacing a single component part of prescribed work can fall outside the inspection requirement, and your electrician should tell you which applies before starting.

    How it shows on your paperwork

    You get a prescribed Certificate of Electrical Safety for the work. Under the Electricity Safety Act, it is due within 4 business days after the inspector's certificate of inspection is given, so the inspection comes first and the certificate follows. Keep it with your house records; our guide to certificates explains what to check on it.

    Services that can help

    Read more in our guides

    Related questions

    Sources for this answer

    5 sources, with the date each was checked
    1. 1.Energy Safe Victoria: A prescribed certificate is for all major electrical wiring work in all types of premises. In a domestic property this covers all work done on wiring and equipment where the electricity cannot be switched off. This… Accessed 30 September 2026.
    2. 2.Energy Safe Victoria: 'Prescribed' certificates are for electrical installation work that requires inspection by a Licensed Electrical inspector. This includes (but is not limited to): Consumer mains cables, main switchboard, meter box and… Accessed 30 September 2026.
    3. 3.Energy Safe Victoria: The electrician has eight business days after the work is completed to have that work inspected by a licensed electrical inspector (LEI). If an electrician replaces a main switchboard at a property, power cannot go back… Accessed 30 September 2026.
    4. 4.Energy Safe Victoria: In effect, Regulation 249(4) allows the repair or maintenance (including replacement) of a single component part of an electrical installation that is classified as prescribed electrical installation work to be excluded… Accessed 30 September 2026.
    5. 5.Victorian Legislation (legislation.vic.gov.au) - Electricity Safety Act 1998, authorised version 089 (effective 8 Sep 2026): (a) in the case of prescribed electrical installation work, is 4 business days after the certificate of inspection of that work is given under section 45(3); and Accessed 30 September 2026.

    General information for homes in Victoria. Every installation is different, so treat this as a starting point. Where this answer refers to Victorian safety or rental rules, the sources above have the current requirements.