Skip to content
    • Licensed electrical contractor (REC 38187)
    • Lifetime workmanship guarantee
    • Upfront pricing: you get the price before we start
    • 5.0 from 21 Google reviews
    • Family-run, 19 years in the industry
    • Free, no-obligation quotes
    • Based in Altona Meadows, serving Melbourne's west
    • One local team for electrical, heating and cooling
    • Open Mon–Sat, 7am–5:30pm
    Booking & visits

    What happens during an electrical or air conditioning visit?

    Updated 9 October 2026

    The short answer
    We arrive at the time we confirmed, look at the job with you, explain what we've found and your options, and give you the price before work starts. Then we do the work, test it and walk you through what was done. For electrical work, you receive a Certificate of Electrical Safety, the legal record of that work.

    Arrival and a look at the job

    We'll ask you to show us the problem or the area, then go to the switchboard or the system. For a fault, that usually means testing circuits until the cause shows itself. For air conditioning, it means running the system and checking filters, coils, the drain and the electrical connection. For new work, we confirm positions, cable routes and what's behind the wall or ceiling before anything is cut.

    Findings, options and the price

    Before anything is fixed or installed, we explain what we found in plain terms and give you the options where there are some. If a repair will do the job, we'll say so, even when a replacement is also on the table. You get the price before work starts, and nothing goes ahead until you agree.

    Doing and testing the work

    Testing and working on circuits means switching power off for a while, so we'll tell you before it goes off and roughly for how long. Electrical work is tested before it goes back into service, and air conditioning is run and checked once the work is finished.

    Main switchboard, mains and meter box work is different. It's prescribed work, and power can't go back on to a new main switchboard until a Licensed Electrical Inspector has inspected it, so we plan the inspection into the day.

    Before we leave

    We walk you through what was done and anything worth keeping an eye on. A licensed electrician must provide a Certificate of Electrical Safety whenever they complete electrical installation work, repairs included. For lights, power points and air conditioning, Energy Safe Victoria says your copy is due within 30 days. Gas work is done by a licensed gasfitter and comes with its own paperwork.

    Services that can help

    Read more in our guides

    Related questions

    Sources for this answer

    3 sources, with the date each was checked
    1. 1.Energy Safe Victoria: The electrician has eight business days after the work is completed to have that work inspected by a licensed electrical inspector (LEI). If an electrician replaces a main switchboard at a property, power cannot go back… Accessed 30 September 2026.
    2. 2.Energy Safe Victoria: Whenever a licensed electrician completes any electrical installation work, they must provide a Certificate of Electrical Safety (COES). Accessed 30 September 2026.
    3. 3.Energy Safe Victoria: The Registered Electrical Contractor or Licensed Electrical Worker will complete the COES and is required to provide you with a copy within 30 days. Accessed 30 September 2026.

    General information for homes in Victoria. Every installation is different, so treat this as a starting point. Where this answer refers to Victorian safety or rental rules, the sources above have the current requirements.